Installation of a new training room, male and female locker rooms and large canteen area.

Services Provided

One day project over 2 floors to install a small Ground Floor Training Room consisting of 12qty training tables for inhouse training sessions for the bodyshop workers.
The first floor consisted of two locker changing room facilities for both female and male which consisted of over 90 individual lockers and various sized changing room benching to compliment both areas.

A large canteen area with 20 4-seater double entry canteen seats with tables all of which had to be floor fixed.

Works were made difficult by the fact that all first floor product needed to be carried up the stairs which involved in not dismantling the canteen seating.

Resource used

  • Labour. 32 man hours
  • 1 x 40ft Vehicle
  • 1 x 18t vehicle

Suppliers used

  • Dobergo
  • Walter Knoll
  • Steelcase